Finished Kitchen....

Well I am calling it done. I am sure things will change over time but for now we are done. Look a finished kitchen. Interior Temp New Sill Cool Faucet Stuff Newish art? OK an old painting cut up and framed. Same doggie door cleaned up. I know but it is funny. He Smiles.

I am Just so excited!!!

The kitchen is 97% done and should be complete this week. Tile finished and grouted and now all we need is the molding finished and the final coat of paint. Just a reminder of how bad it was... I will post the final pictures when complete.

We Are Getting closer

We had a productive weekend. Doug And Stephen got the roof finished. No leaks so far. Shane has a Shower and the backsplash in the kitchen is almost done. Ignore the mess it is hard living in a construction zone. Just needs grout. Stephen did a lovely job creating my new window sill. New molding around the windows and doors in kitchen just need the baseboards and cabinet kick-plates installed and the final coat of paint and the kitchen will be done. See I told you Shane has a shower. We have a sink too. Look accent tiles. List of things needed to be done in the bathroom. Door wall still needs Sheetrock. Tape and mud the walls. Paint walls. Install chair molding, crown molding and baseboards. Complete tile to crown molding. And the heat lamp needs to be installed. Wiring still needs to be finished