Bathroom Progress Slow and Steady

So our 4 days off to do the bathroom was not enough. We have one of the three fixtures working but there is a floor and we do have the trailer.

*Day 1: Gut the room. Remove cast iron piping. Find out the floor was not stable. Doug and Stephen repair the floor.

*Day 2: Plumbing installed and the floor gets tiled.

*Day 3: Tub gets fixed in place.

*Day 4: Shane's Birthday. Trying to rest but obsessing and the walls start coming down and start getting replaced.

*Day 5: We have a toilet. Indoor plumbing is the way to go really.

*Day 6: Floor finally grouted. Gray grout with white tiles.
I do think this floor is what most people remove from their bathrooms but I like it.